Item
|
Project Name
|
Scope of Service
|
Client
|
1
|
Process Fired Heater Safety Upgrades Jeddah & Yanbu Refineries
|
Upgrade the existing Process Fired Heaters to conform to current client's Engineering Specifications and practices & prepare detailed design in accordance w/ client's requirements. To provide process de-pressuring systems, positive control of hydrocarbon streams to the heaters during light off & test facilities for critical valves.
|
Saudi ARAMCO
|
2
|
Boiler Management and Fired Heater ESD System Rabigh Refinery
|
Provide Detailed Design for the Burner Management System (BMS) and Fired Heater ESD System in accordance with applicable Saudi Aramco Engineering Standards and procedures.
|
Saudi ARAMCO
|
3
|
As -Built of Key Drawings For Distribution Operations
|
Preparing, updating and revising/redrawing As-Built Key Drawings in accordance w/ Saudi Aramco Drafting Standards. This covers the locations of Yanbu Bulk Plant, Yanbu Air Fueling Unit, Tabuk Air Fueling Unit and Khamis Mushayat Air Fueling Unit.
|
Saudi ARAMCO
|
4
|
Refinery Process Fired Heater Safety Updrade At Jeddah Refinery
|
This project is to upgrade the existing Process Fired Heaters at Jeddah Refinery to conform to current Saudi Aramco Engineering Specifications and Practices. To provide process de-pressuring systems, positive control of hydrocarbon streams to the heaters during light off and test facilities for critical valves.
|
Saudi ARAMCO
|
5
|
Project No. 331-E
|
Engineering Study For Burning LPG - GT1,2,3 & 4
|
Saudi ARAMCO
|
6
|
Relief and Emergency Isolation Valves - Rabigh Refinery
|
Provide client with Detail Engineering Design, Procurement Assistance ad preparation of Construction Bid Package for Emergency Isolation Valves and Relief Valve Isolation and Spares.
|
Saudi ARAMCO
|